[av_slideshow_accordion slide_type=’image-based’ link=’category’ items=’5′ offset=’0′ size=’featured’ autoplay=’false’ interval=’5′ title=’active’ accordion_align=” custom_title_size=” custom_excerpt_size=”]
[av_slide_accordion id=’4301′ title=’Current Layout & Demolition Plan’ link=’lightbox’ link_target=”][/av_slide_accordion]
[av_slide_accordion id=’4300′ title=’New Layout’ link=’lightbox’ link_target=”][/av_slide_accordion]
[av_slide_accordion id=’4302′ title=’Servery Layout & Hall Elevations’ link=’lightbox’ link_target=”][/av_slide_accordion]
[av_slide_accordion id=’4303′ title=’Washroom Elevations’ link=’lightbox’ link_target=”][/av_slide_accordion]
[/av_slideshow_accordion]
[av_textblock size=” font_color=” color=”]
RENOVATING THE LOWER LEVEL OF THE CHURCH
Some areas in the lower level have not been touched since the church was built; other areas are simply in need to facelifts; but all of it is being done to address some of the top concerns of parishioners: New Servery/Kitchen Facilities, Additional Washrooms & Disability Access. Included is the following:
NEW SERVERY (KITCHEN AREA)
- Relocate servery to better utilize hall space and servery area.
- New Island (10’x30”) with cabinet doors for large item storage underneath
- New millwork/countertops with drywall facing outside walls
- One double sink + food prep sink
- New wall mounted sink in the corner
- Install new appliances
- New Flooring
- New lighting
- New electrical
- New exhaust hood
PARISH HALL NORTH
- Resurface floor
- Install new doors on East Side with panic hardware and ADO HC Access
- Install new doors on Southwest Side with panic hardware into corridor.
- Install panic hardware and ADO HC Access on Southeast doors
- Remove speaker boxes
- Build coat closets near West Side doors
- Build storage closet near East side doors
- Remove old exhaust fan in Northeast Window
- Add laminate coating of drywall on all walls and paint
- On east and west side of large beams, replace tin with drywall ceiling and center existing light fixtures in the middle.
NORTH EXTERIOR ENTRANCE TO HALL AND HALLWAY
- Resurface floor
- Install new outer doors with glass and panic hardware and ADO HC Access
- Repair owning over door
- Improve outer lighting
- Drywall patch and repair
SHOWER ROOM & UNIVERSAL WASHROOM
Demolition north wall to create universal washroom & shower room
- Remove tile floor
- Remove plumbing wall
- Demo ceiling
- Cut and remove concrete floor
- Install new drywall partition
- Relocate plumbing in floor
- Re-pour concrete floor
- Install new plumbing fixtures (2 new toilets; 2 new sinks)
- Install new floor ($5 mat allowance)
- Install new washroom accessories and mirrors
- Install new ADO HC access to door (x2)
- Install new built-in bench and shower in shower room
PUBLIC CORRIDOR
- New floors
- Repair broken stairs
- Give clean look to brick near West Exit
- Install new fire exit door with panic hardware and open out
- Reface walls with new ¼” drywall
- Remove door frame and door in hallway (in the middle currently going nowhere.
- New 45 min fire rated door
- New lighting fixtures
PARISH HALL SOUTH & STUDENT LOUNGE
- Demo ceiling
- Drywall ceiling with 2 layers of 5/8” material with Roc-Sol insulation
- Hang chandeliers to mimic the existing parish hall lighting
- Demo top 2/3 of East/West walls leaving the lower 1/3 wainscoting alone.
- Replace top portion of walls with drywall.
- Drywall over existing paneling on North and South Walls
- New Floor
- Install appropriate electrical outlets in room
- Install moveable panel wall along North/South divide. Barn doors
- Install new thermal windows (x7)
- Paint room
NEW MEN’S & WOMEN’S WASHROOMS
- New Concrete floor slab where floor and floor joists removed.
- Install Exhaust fans and exit West Window
- New electrical
- Install New countertops
- Install 3 new sinks and faucets
- Install 7 new toilets and 1 urinal
- Install new toilet partitions (x6)
- New washroom accessories/mirrors
ENTRY AREA
- New lighting
- Refinish floor
- Cut new opening in wall so that the stairs can continue straight through
- Adjust stairs to upstairs so that this can happen
- Install new doors to main room in lower level, stairs to upper level, storage areas.
UPSTAIRS VESTIBULE
- Remove wooden doors and hardware at West staircase
- Install water fountain in vestibule
- Install new power outlets in vestibule
- Build extra confessional closet with two glass locking doors and screen wall between. Re-use vestibule doors and build new frames
- Build Ambrie and mount on wall
- Remove and install new handrail
- Replace row of tiles to create visual line for vestibule steps.
- Repair and retile stairs going to choir loft with oak treads and nosings
- Repair and retile stairs going to washrooms.
- Replace choir loft door with glass/wood door.
- Place outlet in floor where baptism font will go.
Detailed Architectural Drawings can be found HERE.
[/av_textblock]